What is a Bill of Quantities (BOQ)?
A bill of quantities is an itemised document that lists every material, labour task, and item of work required to complete a construction project — together with the quantities and unit rates for each line. Contractors, homeowners, and project managers use it to price jobs, compare quotes, and control spending from groundbreak to handover.
Standard sections inside a BOQ
A well-structured Bill of Quantities follows a logical trade-by-trade order. The most common sections are:
Preliminaries
Site setup costs: scaffolding, temporary utilities, project management, and site security.
Substructure
Foundation works including excavation, concrete pad, and ground-floor slab.
Superstructure
Structural frame above ground: columns, beams, brickwork, blockwork, and slab.
Finishes
Internal and external finishes: plaster, paint, tiling, ceiling, and woodwork.
Services (MEP)
Mechanical, electrical, and plumbing installations — wiring, pipes, fixtures.
External Works
Landscaping, paving, boundary walls, drainage, and site access roads.
Typical line items you'll find
Within those sections, a BOQ breaks down into granular material and labour items such as: cement, structural steel rebar, bricks, sand, aggregate, concrete hollow blocks (blockwork), internal plaster, external render, paint, and associated skilled labour for each trade. Each line shows the description, unit of measurement (m³, m², kg, Nr), quantity, rate, and total amount.
Why do contractors and homeowners use a BOQ?
When every bidding contractor quotes against the exact same quantity list, their prices become directly comparable — apples to apples. This prevents front-loaded bids, reduces on-site disputes over scope changes, and gives the project owner a clear baseline to track spending against as the build progresses. A detailed BOQ is also required by most banks as part of a construction finance application.
How does an AI BOQ generator speed this up?
Preparing a BOQ manually requires a quantity surveyor to spend days measuring from drawings and looking up current material rates. Our AI BOQ generator automates both steps: it estimates quantities from your project size using industry-standard yield formulas and then applies current local rates for your country — delivering a complete, editable bill in 30 seconds. As with any automated estimate, the output should always be reviewed by the user and adjusted to reflect any project-specific conditions before being sent to contractors.